Mon – Fri: 8am – 4pm

Apartment Complex I/A Septic Installation

Wellfleet, MA
September 2022
Septic

About the Project

Brundage Site Work installed a large Innovative/Alternative (I/A) septic treatment system for a multi-unit apartment complex in the center of Wellfleet. The engineered design featured an AdvanTex® RainEco nitrogen reduction system, providing an advanced and environmentally responsible wastewater solution.

This project required precise coordination and excavation in a tight downtown setting — balancing performance, efficiency, and compliance with local Title V and nitrogen mitigation standards.

The completed system delivers reliable treatment capacity and long-term environmental protection, helping reduce nutrient loading in sensitive coastal areas.

Scope of Work:

  • Excavation and system installation
  • AdvanTex RainEco nitrogen reduction unit
  • Multi-tank configuration for apartment complex
  • Backfill, grading, and site restoration
See Our Work

Recent Projects

Wellfleet, MA
June 2024
Wellfleet, MA
January 2024
Chatham, MA
November 2022
Wellfleet, MA
October 2022

Read to Start Your Project?

Need site work done on your residential or commercial property on Cape Cod? Contact us today for a free estimate.