Mon – Fri: 8am – 4pm

Custom Home Foundation

Chatham, MA
November 2022
Concrete

About the Project

Brundage Site Work completed the foundation for a custom waterfront home in Chatham, designed with precise elevations to meet floodplain requirements. Every detail, from the layout to the final pour, had to align with engineered specifications to ensure compliance and long-term structural integrity.

The project included the installation of multiple cast-in-place flood vents built directly into the foundation walls, providing flood protection without compromising strength or appearance.

From excavation to final wall pour, the BSW crew completed this foundation in just four and a half days, showcasing the team’s coordination, experience, and efficiency in complex coastal construction environments.

Scope of Work:

  • Footings, formwork, and reinforcement
  • Precision elevation alignment for floodplain compliance
  • Cast-in-place flood vent installation
  • Full foundation completion in 4.5 days
See Our Work

Recent Projects

Wellfleet, MA
June 2024
Wellfleet, MA
January 2024
Chatham, MA
November 2022
Wellfleet, MA
October 2022

Read to Start Your Project?

Need site work done on your residential or commercial property on Cape Cod? Contact us today for a free estimate.