Need Septic or Sewer Work?
Fill out our Concrete Project Request form and we will get back to you ASAP.
Septic & Sewer
Services
We can guide you through the process.
Septic Installations/Repairs
Before any work is carried out we evaluate your site for installation or repair. Size, soil type, water table, excavation, permits etc.
Municipal Sewer Connections
We will assess the requirements for your town sewer connection. The town will then check that their current system has room for your plans.
Title V Insepections
The Title 5 inspection is a comprehensive process. It includes learning the history of the system, the size of the household, and a review of the permit. Also, the tank, distribution box, drain field bed, and the house are inspected. The inspector compares the size of the tank and the expected water use.
SEPTIC & sewer Services
Your Septic / Sewer Project Step-by-step.
01
ENGINEERING
Before your project begins, engineer’s plans need to be provided. If you need a referral, please call our office and someone will assist you.
02
CONTACT US
Once we receive your engineers plans, a site visit will be scheduled and conducted by one of our project managers. These visits help us determine the scope of work, to be estimated appropriately and accurately.
03
CONTRACT
If you are satisfied with the estimate provided by BSW, a signature for the contract and project will need to be provided before the office can move onto applying for any necessary permits
04
SCHEDULING
Once permits are received by the office, we can better determine a projected start date. Scheduling of work is directly related to our current work load, machine availability and mobilization, and staffing.
05
PROJECT START
Once we have set and confirmed a project start date, an office member from BSW will be in contact as the project draws near for any additional information, concerns, or questions. You may hear from our office ahead of time, to mobilize machines for an easy start the day of.
06
INSPECTION
Work provided by BSW will need to be inspected by the corresponding engineer who provided the plans, and in some cases, town officials.
07
WORK COMPLETION
After the necessary inspections are completed and passed, we schedule the backfill and necessary grading to complete the project. A final invoice will be sent once BSW has completed the contracted work, and left the site.