Septic Installations/Repairs

Before any work is carried out we evaluate your site for installation or repair. Size, soil type, water table, excavation, permits etc.

Municipal Sewer Connections

We will assess the requirements for your town sewer connection. The town will then check that their current system has room for your plans.

Title V Insepections

The Title 5 inspection is a comprehensive process. It includes learning the history of the system, the size of the household, and a review of the permit. Also, the tank, distribution box, drain field bed, and the house are inspected. The inspector compares the size of the tank and the expected water use.

SEPTIC & sewer Services

Your Septic / Sewer Project Step-by-step.

01

ENGINEERING

Before your project begins, engineer’s plans need to be provided. If you need a referral, please call our office and someone will assist you.

02

CONTACT US

Once we receive your engineers plans, a site visit will be scheduled and conducted by one of our project managers. These visits help us determine the scope of work, to be estimated appropriately and accurately.

03

CONTRACT

If you are satisfied with the estimate provided by BSW, a signature for the contract and project will need to be provided before the office can move onto applying for any necessary permits

04

SCHEDULING

Once permits are received by the office, we can better determine a projected start date. Scheduling of work is directly related to our current work load, machine availability and mobilization, and staffing.

05

PROJECT START

Once we have set and confirmed a project start date, an office member from BSW will be in contact as the project draws near for any additional information, concerns, or questions. You may hear from our office ahead of time, to mobilize machines for an easy start the day of.

06

INSPECTION

Work provided by BSW will need to be inspected by the corresponding engineer who provided the plans, and in some cases, town officials.

07

WORK COMPLETION

After the necessary inspections are completed and passed, we schedule the backfill and necessary grading to complete the project. A final invoice will be sent once BSW has completed the contracted work, and left the site.

Before the project

Once an engineer has provided the customer with the site plans necessary for work to be conducted, BSW will begin the process of generating an estimate. After contracts are signed and the project deposit received, we apply for permits. Scheduling, mobilization, and project start are discussed after all permits are issued.t.


During/After the project

Most engineered site plans will require the town and the engineer to inspect the work provided by BSW. Once inspections are completed, BSW will schedule the back-fill and completion of the work.


SEPTIC / SEWER FAQ'S

  • How do I know I need an engineer?

    Please call and speak to our office staff for help.

  • Will seasonal weather impact BSW’s ability to complete my project?

    We work all four seasons, weather may cause a delay – we will be there!

  • When can I get on your schedule?

    We add projects to our schedule once permits (if necessary) are received.